CROSSPOINT™ · PHOENIX / EAST VALLEY

Do I Need a Firestop Special Inspection in Phoenix?

Call 480-988-6602 Request a quote

Short answer

Sometimes. Under IBC Chapter 17 (Section 1705.18 in the 2018 IBC), special inspection of fire-resistant penetrations and joints is required in high-rise buildings, in Risk Category III and IV buildings, and wherever the construction documents call for it. Phoenix lists it as discipline ARC-3, and Maricopa County certificates show it as its own line. Inspections are done to ASTM E2174 (penetrations) and ASTM E2393 (joints).

Check your specs, not just the code

Even if the code doesn't trigger it, the project specs often do. If Section 07 84 13 or 07 84 43 says the owner will hire an agency to inspect to E2174 or E2393, it's required on that job. We see this a lot on hotels, senior living and multifamily jobs around Tempe and the East Valley. Sealant in the detail cuts only counts if it's part of a tested, listed system.

Timing matters

Firestopping has to be inspected before it gets covered up. If the walls are already closed, plan for destructive sampling.

City of Phoenix approved inspectors for all your special inspection needs.

Next step

Send us the drawings and the 07 84 sections. CrossPoint™ will tell you what applies and quote it. Call 480-988-6602.

CrossPoint Testing and Inspection Services, LLC · 7931 E Pecos Rd, Suite 203, Mesa, AZ 85212 · Veteran-owned

Call 480-988-6602

Steel, bolting, anchors, firestop, or fireproofing on a Phoenix or Valley job — call the Mesa office.

Call 480-988-6602 Request a quote All services
24/7 including weekends. Night call-out from Mesa, AZ — 7931 E Pecos Rd, Suite 203.