When Does Floor Flatness Testing Have to Be Done?

Call 480-988-6602 Request a quote

Short answer

ASTM E1155 requires FF/FL measurements within 72 hours after the slab is finished, before shoring is removed on elevated slabs. If you miss that window, the numbers can't be used for acceptance. Book the tester before the pour, not after.

Why it matters for warehouses

Distribution and warehouse slabs along the Loop 202, Loop 303 and I-10 corridors often have FF/FL specs tied to forklift and racking performance. If you test late or don't test at all, you can't defend the slab if the owner disputes it.

What you get

Overall FF/FL numbers and local section values, with a report you can hand the owner.

City of Phoenix approved inspectors for all your special inspection needs.

Next step

Call CrossPoint™ at 480-988-6602 — contact us for a quote with your pour date.

CrossPoint Testing and Inspection Services, LLC · 7931 E Pecos Rd, Suite 203, Mesa, AZ 85212 · Veteran-owned

Call 480-988-6602

Steel, bolting, anchors, firestop, or fireproofing on a Phoenix or Valley job — call the Mesa office.

Call 480-988-6602 Request a quote All services
24/7 including weekends. Night call-out from Mesa, AZ — 7931 E Pecos Rd, Suite 203.